entrance shall provide protection against mud and sediment being tracked off the construction site onto adjacent public or private pavement. The contractor shall perform street scraping daily at the end of the work period and street sweeping once a week minimum. The sediment is to be returned to the source location, on-site. The street surface shall not be cleaned by use of flushing with water. Trash and debris shall be picked up and disposed of in accordance with local, state, and federal regulations. The contractor is responsible for maintenance of the erosion control devices and measures. The erosion control devices ad measures shall be inspected and maintained a minimum of once per week and within 24 hours after a 1/2" storm event. Bid Opening Information Bids are due on June 1, 2022 NLT 2:00PM. The call will be open at 1:45pm and bids will be read at 2:00pm. Call in information: 872/701-0185 Phone conference ID: 680913345# All other terms and conditions remain the same. END Amendment 00001
Bid Protests Not Available