Hermit Lake Water System, Phase 1 - Well Installation, White Mountain National Forest, NH. NAICS - 237110. Work includes, but is not limited to: labor, equipment, materials, mobilization, drilling, casing, water sampling and testing, for a new well installation, at a remote area, on the White Mountain NF, NH. Job site is at the Hermit Lake Area, elevation 3,875 feet. Contractor will likely stage materials at 2000 feet, then airlift equipment and materials to the job site. Contract time - 30 calendar days. Start on/around May 1, 2003. Cost Range: $25,000 - $100,000.
Bid Protests Not Available