Contractor to furnish all labor, equipment, supplies, and materials for the drilling and installation of a water well to be located in Elko County, Nevada. The project is esimated between $25,000 and $100,000. Payment protection is required for all BLM construction projects exceeding $25,000.00 and must be presented after award and before the notice to proceed can be issued. This is a 100% small business set-aside. A performance period of 30 days has been established with an estimated start date the week of 30 September 2002. A site tour is scheduled for 19 Sesptember 2002 at 8AM at the Elko BLM Field Office, 3900 East Idaho Street, Elko, Nevada 89801. This request for quotation and its attachments are available by e-mailing request to:
[email protected] or faxing request to: 775-861-6634. Quote number FAQ020047 must be referenced.
Bid Protests Not Available