Construction of five Floodwater Retarding Structures in Lewis and Knox Counties, Missouri. Work consists of construction of five floodwater retarding structures consisting of approximately 29.8 AC of clearing and grubbing; 17,202 CY excavation; 268 LF 6 inch diameter welded steel pipe; 267 LF 8 inch diameter welded steel pipe; 117 LF 10 inch diameter welded steel pipe; 108,906 CY earthfill; 8,785 LF heavy duty barbed wire fence; 32.2 AC seeding and mulching; 5 stock watering systems. Solicitation will be available at http://www.fedbizopps.gov on or about July 12, 2004. Requests for hardcopy must be in writing. Fax your requests to 573-876-0914.
No notice will be given for amendments or modifications to this solicitation.
Bid Protests Not Available