This solicitation is to provide services for the construction of a 90ft. glue laminated, single span superstructure with a gabion basket spread footing substructure. The project will be built to accommodate small (OHV) vehicles, pedestrians and horse traffic. The finished traveled way width is 6 feet. Other work items incidental to this project include construction of approximately 100 feet of trail and bridge approaches, including placement of boulders in lieu of rail at the ends of the bridge and boulders for traffic control (deterrent) at the original crossing location and obliteration of t he original crossing approaches. The project site is located on the North Fork Burnt River at MP 29.25 on Trail 1972, on the Whitman Unit of the Wallowa-Whitman National Forest, Baker County, Oregon. The engineers estimate is between $50,000 and $250,000. This solicitation will be posted to FebBizOpps on or about July 25, 2003.
Bid Protests Not Available