Lolo National Forest, Upper Lolo Culvert Replacements. Work consists of removing five existing undersized culverts and replacing with new structures,including 2 pipe arches, 2 bottomless arches and 1 pre-cast concrete bridge. Contract will include base and optional items. Contract operations will be restricted to work between July 15 and August 31 in 2008 and possibly 2009. Solicitation detailing specifications and contract time requirements will be posted on this website on approximately July 30, 2007.PRICE RANGE (per FAR 36.204): Between $250,000-$500,000.
PRE-PROPOSAL SITE VISIT: A pre-proposal site visit is scheduled for 8:00 A.M. ON AUGUST 7, 2007 at the Lolo National Forest Supervisor's Office, Building 24 - Fort Missoula, Missoula MT 59804. Attendees must bring their own transportation for the field visit and should bring a printed copy of the solicitation and drawings. Interested Offerors are requested to RSVP for the site visit by calling Nancy Taylor at (406) 329-3772.
Bid Protests Not Available