The project includes the construction of asphalt concrete and portland cement concrete paved roads and parking areas, a concrete boat ramp, installation of rip rap, gabions, corrugated steel pipe and gates. Project is located off the Bush Highway that runs along the Lower Salt River, one half mile east of Usery Pass Road in T2N, R7E, Section 2, six miles north of Mesa, Arizona. Contract time is 45 calendar days. Solicitation will be issued/posted to FedBizOps (www.eps.gov) on or about July 25, 2003, with bids due August 26, 2003. Government estimates is between $250,000 and $500,000. Bid Guarantee, performance and payment bonds are required.