This project consists of two reaches of the Fishing Creek along Maple Grove Road inFishing Creek Township and Benton Township.
Reach 1, consists of excavation and installation of 200+/- feet of R-6 riprap along the
left bank of the Fishing Creek in Benton Township.
Reach 2, deposition removal in the stream bed of the Fishing Creek, at the locations
flagged by the COR, to match the existing bed grade up and downstream. Excess
spoil material shall be removed to an off-site location selected by the Contractor.
And installation of 150+/- feet of R-6 riprap along the left bank of the Fishing Creek
in Fishing Creek Township.
Stream flow diversion and dewatering as necessary.