Arnold AFB, TN has a requirement to replace the cooling coils and piping for two dryer areas. One of the dryer dimensions are approximately 12â in diameter and 50â in length 12â and the second dryer is approximately 10â in diameter and 50.â The work will consist of installing new cooling coils, new interior carbon steel cooling water piping manifolds, and new carbon steel piping to include approximately 300â of 4â pipe, 300 â of 6â pipe, 200â of 1â pipe, 8 large control room valves (provided as GFE) and miscellaneous control room piping components (gages and small valves.). Period of Performance is to be completed by 24 November 2003. FOB Arnold AFB, TN. The estimated order of magnitude is between $100,000 to $250,000. For more information on 03B0032AR--Cooling Coil and Piping please refer to http://www.pixs.wpafb.af.mil/pixslibr/03B0032AR/03B0032AR.asp