NA The work to be performed consists of the construction of a Floodwall as part of a flood project along the Blue River, between the Bannister Federal Complex Flood Protection and the Brice R. Watkins Bridge. The project includes the construction of a floodw all with associated earthwork, modifications to the existing sanitary sewers and drainage structures, and the construction of required drainage ditches. The estimated cost range of the project is from $1,000,000.00 to $5,000,000.00. Technical POC is Mary P erlea @ (816)-983-3602 NOTE: All Real Estate will be available before making an award. No contract award will be made without obtaining all real estate rights
Bid Protests Not Available