Contractor to provide spill response and spill cleanup services for oil and chemicals at Watervliet Arsenal per the attached Statement of Work (SOW). The contractor shall furnish sufficient technical, supervisory,and administrative personnel to ensure the expeditious accomplishment of the work specified in the Statement of Work (SOW). The contractor will respond on an as needed basis. Additionally, the contractor shall furnish all services, materials, supplies, equipment and travel required in connection with the SOW.
Service Contract Labor Standards WD 2015-4143 Rev 13 applies and is incorporated.
Watervliet Arsenal POC is Eric Marcy