Work to be performed includes, but is not limited to, mobilization/demobilization, bonds, insurance, taxes, grading, earthwork, liquid chemical feed system, reinforced concrete, pre-fabricated FRP building, metering manhole, electrical, mechanical, piping, valves, painting, soil erosion and sediment control, and all other appurtenances necessary to install dechlorination systems at the Skull Shoals and Aonia Water Treatment Plants.
Bid Protests Not Available