The work involves the demolition of the concrete top slab of an existing below-grade flow measurement vault and demolition of steel pipe and existing electrical and instrumentation in the vault. The work also includes the reconstruction of the concrete top slab with a new access hatch, new steel pipe and piping appurtenances in the vault, the addition of a new magnetic flow meter, new electrical and instrumentation facilities and other related facilities to make for a fully operational flow measurement system for the potable water from the clearwell of the Lester J. Berglund Water Treatment Plant.
Bid Protests Not Available