Common Excavation 100,000 CY 8” Sanitary Sewer 2,500 LF Onsite Borrow Excavation 2,500 CY 48” Sanitary Manhole 10 EA Drainable Aggregate Base 4,800 TON 48”-72” Sanitary Manhole 61 LF Concrete Curb & Gutter 4,400 LF 4” Sanitary Service 1,400 LF Bituminous Pavement 1,400 TON 8” Watermain 2,300 LF Concrete Walk 8,000 SF 1” Water Service 1,350 LF 4” Perf. Subsurface Drain 4,400 LF 12”-24” RCP Storm Sewer 2,150 LF 54” RCP Culverts 280 LF Storm Catch Basin 100 LF Turf Restoration 20 Acres 60” Storm Manhole 3 EA together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Equal Employment Opportunity Provisions and Responsible Contractor Certification.