Point Of Contact Not Available
Ivy Tech Community College Valparaiso campus building is in need of qualified contractor for window replacement project. Approximately 40% of roughly 250 total insulated glass windows are affected at varying degrees of window failure. It's estimated to replace 100 window glass lite (existing frame to remain) and resealing 150 window units. Anticipated Start of Construction: weather permitting late spring/summer 2023 - Installation will need to be carefully coordinated with campus for class scheduling with two week look ahead sequencing with potentially no work times during finals/commencement Anticipated Substantial Completion: three months after start of construction A highly recommended, but optional pre-bid walkthrough will be held at 2:00 P.M., CST, on February 6, 2023 at Ivy Tech Community College, located at 3100 Ivy Tech Dr Valparaiso, Indiana 46383. Participants should meet at in the lobby.
Bid Protests Not Available