The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of expansion of the Wild Horse Ranch WWTP from 0.75 MGD (average daily flow) capacity to 2.25 MGD. The expansion will incorporate biological nutrient removal. Facilities to be constructed or improved include the influent lift station, headworks, aeration basins, secondary clarifiers, disk filters, UV disinfection system, sludge holding tanks and a sludge thickening facility, electrical building and administration building. Included in the project are electrical and instrumentation and controls infrastructure to provide a fully functioning system. A new electrical building and administration building will also be constructed as part of the project.