Sealed Bids for the construction of the WICKS SOUTHPOINTE PHASE 3 LIFT STATION AND FORCE MAIN will be received by City of Gretna, Nebraska, at the office of the Engineer, EAGLE ENGINEERING GROUP, until 10:00 a.m. local time on Thursday, December 19, 2024, at which time the Bids received will be “publicly” opened and read. The Project consists of constructing lift station and 6”dia. force main. Bid Documents may be obtained from the offices of A&D Technical Supply Co., Inc. 4320 S. 89th Street, Omaha, NE 68127, (402)-592-4950. 1822 “N” Street, Lincoln NE 68508, (402)-474-5454 A printed copy of bid documents can be obtained upon receipt of a refundable deposit in the amount of $50.00 payable to Eagle Engineering *An OBE Non-Cash Builder's Card will be accepted in lieu of deposit check. Only complete sets of Bid Documents may be obtained - no partial set orders will be issued. Downloads containing a full set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $20.00 payable to A&D Technical Supply Co., Inc. If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $35.00 payable to A&D Technical Supply Co., Inc. Bid Documents MUST be returned, in good condition, within 14 calendar days from award of the project to obtain a deposit refund. If Bid Documents are NOT returned within the time specified, the deposit check will be forfeited.
Bid Protests Not Available