This project provides for construction of a multi-use path along Westinghouse Blvd between South Tryon Street and Shopton Road West. The purpose of this project is to improve pedestrian safety, bicycle connectivity and pedestrian access. Length – 3.2 miles.
Bid Protests Not Available