Webster PFAS Water Treatment Plants

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Tighe & Bond
Location Webster Massachusetts United states 01570
1. Construction of a 2.16 million gallon per day (MGD) Water Treatment Plant (WTP) housing three GreensandPlus and four Granular Activated Carbon (GAC) filter vessels at the Bigelow Road site. The building is to be approximately 8,825 square feet constructed of masonry walls, steel framed, metal roof, and is inclusive of process, HVAC, plumbing, fire protection, electrical, instrumentation, and SCADA. 2. Construction of a 1.73 MGD WTP housing GAC filter vessels at the Memorial Beach site. The building is to be approximately 3,200 square feet constructed of masonry walls, steel framed, metal roof, and is inclusive of process, HVAC plumbing, electrical, instrumentation, and SCADA. 3. New replacement wells at both Bigelow Road and Memorial Beach. 4. Lining of approximately 1,350 linear feet of existing water main and replacement of approximately 450 linear feet of existing 12-inch water main with a new 12-inch ductile iron water main on Bigelow Road, as well as associated service reconnections, valves, hydrants, and appurtenances. The Work will be substantially completed within 840 calendar days from the date of the Notice to Proceed and completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions within 900 calendar days from the date of the Notice to Proceed.
Bid Protests Not Available

Similar Past Bids

Webster Massachusetts Not Specified
Webster Massachusetts Not Specified
Webster Massachusetts Not Specified
Webster Massachusetts Not Specified
Townsend Massachusetts Not Specified

Similar Opportunities