State Bid

Last Updated on 19 Jul 2023 at 10 PM
RFB
Yuma Arizona

Water Line Replacement - 24th St. to 25th St. between 5th & 6th Avenue

Solicitation ID RFB-23-220
Posted Date 19 Jul 2023 at 10 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency City Of Yuma Az
Location Yuma Arizona United states
Point Of Contact Not Available
Abandon the 2" AC water line from 24th Street to 25th Street between 5th and 6th Avenue and install 2-6" water lines from 24th Street to 25th Street, with one on 5th Avenue and the other on 6th Avenue. Existing water meters are in the back of the properties, new water meters need to be installed on the front of the properties. As well a new 12" PVC water line will be installed along 25th Street between 8th Avenue to approximately 145 feet east of 5th Avenue. Existing asbestos water line will be abandoned in place. These lines will have connected 2 fire hydrants and 14 water services.
Bid Protests Not Available