Federal Bid

Last Updated on 12 Nov 2020 at 9 PM
Solicitation
Picatinny arsenal New jersey

W15QKN-21-R-0005: M1041 9mm CCMCK Marking Cartridges

Solicitation ID W15QKN-21-R-0005
Posted Date 12 Nov 2020 at 9 PM
Archive Date 08 Dec 2020 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office W6qk Acc-Pica
Agency Department Of Defense
Location Picatinny arsenal New jersey United states 07806

The U.S. Army Contracting Command - New Jersey, on behalf of the Office of the Project Manager, Maneuver Ammunition Systems (PM-MAS), issues this competitive request for proposal (RFP) for the production of the M1041, 9mm marking ammunition, is fired from the M9 and M11 pistols, M4 Carbine and eventual use in the M17 and M18 Modular Handgun Systems. Marking rounds (blue/red) will be used with the Close Combat Mission Capability Kit (CCMCK). The CCMCK is a user installed temporary weapon conversion system that allows for the solider to employ an individual weapon (M9, M11 and M4) at a minimum engagement distance of five feet using low velocity marking ammunition while precluding the weapon from firing standard service ammunition. The marking ammunition shall be a reduced-energy, non-lethal cartridge, that leaves a bright, water-soluble color marking compound on target upon impact, without penetrating the soldier Army Combat Uniform (ACI) or Personal Protective Equipment (PPE). The visible impact left by the marking compound allows for an accurate assessment of simulated lethality and shot placement. The contractor shall manufacture, test, inspect, package and deliver the M1041, 9mm marking ammunition. M1041, 9mm marking ammunition will be procured to a Detailed Performance Specification marked Distribution D. The contractor shall provide for all necessary labor, material, supplies, services, facilities, and equipment to perform all of the requirements of the drawing, P-Spec, SOW and RFP. The Government anticipates making one award. All information is to be furnished at no obligation to the Government. The contractor should ensure that all attachments are down loaded and reviewed carefully prior to submission. If a contractor is planning on submitting a proposal in response to the RFP, the contracting officer should be notified prior to the due date to arrange drop off.

Ammendment 0001 has been posted to answer questions.

Additional Questions have been posted - dated November 12, 2020

Bid Protests Not Available

Similar Past Bids

Picatinny arsenal New jersey 06 Nov 2020 at 3 PM
Picatinny arsenal New jersey 30 Nov 2020 at 1 PM
Picatinny arsenal New jersey 05 Nov 2010 at 6 PM
Picatinny arsenal New jersey 07 Sep 2011 at 3 PM
Picatinny arsenal New jersey 18 Aug 2020 at 9 PM