Furnish all labor, material, and equipment required to construct a 1 MG steel reservoir, 3500GPM booster station, approximately 1,350 feet of 20-inch ductile iron pipe, and 1,550 feet of 16-inch ductile iron pipe, along with other associated work as shown in the specifications for Specification No. 1811.
Bid Protests Not Available