The United States Coast Guard is considering whether or not to set-aside an acquisition for HubZone Set-Aside, or Service Disabled Veteran-Owned Small Business, or Small Business Set-Aside. The estimated dollar value of this procurement is between $200,000,00 and $300,000.00.
The small business size standard is less than 1,000 employees. The acquisition is for dry dock and repairs to the USCGC SHRIKE (WPB-87342). The vesselâs homeport is Port Canaveral, FL. All work will be performed at the contractorâs facility.
A one-time geographic restriction for USCGC SHRIKE (WPB-87342) dry dock availability is: âno contract shall be awarded to a facility located beyond 432 nautical miles of the cutterâs homeport located in Port Canaveral, FL.â
The performance period will be 42 calendar days, with a start date of on or about January 18, 2010.
The scope of the acquisition is:
1) Clean and Inspect Fuel Service Tanks
2) Clean and Inspect Grey Water Tank
3) Clean and Inspect Oil and Oily Waste Tanks
4) Clean and Inspect Sewage Holding Tank
5) Inspect Pilothouse Aluminum Deck
6) Clean and Inspect Simplex Sea Strainers
7) Overhaul and Renew Sea Valves
8) Renew Stern Tube Sea Water Piping
9) Perform Ultrasonic Thickness Measurements â Underwater Hull Plating
10) Remove, Inspect, and Reinstall Propeller Shafts
11) Straighten Shaft
12) Renew Intermediate Water-Lubricated Shaft Bearings
13) Renew Aft Water-Lubricated Shaft Bearings
14) Remove, Inspect, and Reinstall Propellers
15) Remove, Inspect and Reinstall Rudder Assemblies
16) Realign Main Engine/Reduction Gear
17) Renew Depth Indicating Transducer
18) Renew Transducer Fairing
19) Modify and Renew Cathodic Protection System
20) Preserve Underwater Body â â100%)
21) Routine Dry Docking
22) Provide Temporary Logistics
23) Preserve Bilge Surfaces in the Lazarette
24) Inspect Sea Chest Riser Piping and Flanges
25) Create Forepeak Void
26) Preserve Forward Peak Compartment
27) Prepare and Prime Main Deck Surfaces
28) Preserve RHIB Wet Notch Deck and Stern Door Interior Surfaces
29) Remove, Inspect and Reinstall Stern Launch Door Pivot Pins, Bushings and Washers
30) Inspect RHIB Notch Skid Pads
31) Install Forward RHIB Notch Skid Pad
32) Install Dirty Oil Tank Liquid Level Indicator
Provide protective deck covering material. Trained welders who have been certified by the applicable regulatory code performance qualification procedures, shall accomplish all welding and brazing. At the present time this acquisition is expected to be issued small business set-aside. However, in accordance with FAR 19.1305 and FAR 19.1405, if your firm is and intends to submit an offer on this acquisition, please include the following (a) positive statement of your intent to submit a quotation for this solicitation as a prime contractor; (b) evidence of experience in work similar in type and scope to include contract numbers, project title, dollar amount, points of contact and phone numbers; (c) Past Performance references with points of contacts and phone numbers. At least two references are requested but more are desirable. Your response is required by July 14, 2009.
All of the above must be submitted in sufficient detail for a decision to be made on a HubZone Set-Aside, Service Disabled Veteran-Owned Small Business or a Small Business Set-Aside. Failure to submit information requested may result in an unrestricted acquisition. A decision on whether this will be pursued as HubZone Set-Aside, Service Disable Veteran-Owned Small Business or Small Business Set-Aside or on an unrestricted basis will be posted to the FEDBIZOPS website at http://www.eps.gov.
Bid Protests Not Available