Point Of Contact Not Available
The Project will reinforce an existing loading dock and generally consists of the installation of three machine augered 18 inch diameter shafts approximately 12 feet deep, placement of concrete and internal reinforcement in the shafts, construction of pile caps doweled to the existing foundation wall, all for the loading dock located at the Authority’s Wastewater Treatment Plant.
Bid Protests Not Available