State Bid

Last Updated on 06 Oct 2021 at 1 AM
Aurora Colorado

UCHealth AMC OR Integration & Refresh

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Turner Construction Company
Location Aurora Colorado United states
Point Of Contact Not Available
Project Info 1. The project will transform six (6) existing operating rooms (OR’s) with new OR integration technology by integrating compatible surgical devices to simplify OR workflow and maximize efficiency. Phase 1 of the project will include Critical Care Wing (CCW) OR 9, Anschutz Inpatient Pavilion (AIP) OR 16 and Anschutz Outpatient Pavilion (AOP) OR’s 9, 11, 14 and 15 (6 total OR’s). 2. Work covered also includes updating architectural finishes, mechanical, electrical and plumbing modifications (MEP) and replace existing booms. Phase 1 will be completed one (1) OR at a time and will have six (6) construction phases. 3. Please reference the 7 Alternates shown in the Spec Section 01 23 00. 4. Tax Exempt Status - Owner is exempt from State of Colorado.
Bid Protests Not Available

Similar Past Bids

Colorado 09 Oct 2021 at 4 AM
Aurora Colorado Not Specified
Colorado 09 Oct 2021 at 4 AM
Location Unknown Not Specified
Longmont Colorado Not Specified