The purpose of the effort is to fabricate Tunnel 9 Diaphragm Area Hardware to meet the operational needs of the Tunnel 9 facility. The fabricator shall manufacture the items listed in Table 1 of the attached Statement of Work and the corresponding drawings. The fabricator shall supply a copy of the required reports specified in each drawing. The fabricator shall supply 100% inspection report for each part. The fabricator shall supply a certificate of compliance for each part. Drawings and parts subject to distribution statement as contained in drawings.