Federal Bid

Last Updated on 19 Oct 2021 at 7 PM
Solicitation
Roy Washington

Turner Brewer Septic and WPS

Solicitation ID 75H70122Q00003
Posted Date 19 Oct 2021 at 7 PM
Archive Date 03 Dec 2021 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Div Of Engineering Svcs - Seattle
Agency Department Of Health And Human Services
Location Roy Washington United states 98580

Work is to be completed to a private home, under the jurisdiction of Pierce County. The contractor must review site conditions, and report any concerns or discrepancies to the Contracting Officer’s Representative (COR) in writing prior to beginning construction. The design is detailed in the County Approved Design, Attachment 1.

In accordance with the Design, the contractor must: 
 
D.1.  Work Requirements: The septic system and water pressure system installation shall include: 
          D.1.1. Mobilization and demobilization.
          D.1.2. Installation of approximately 15 linear feet of 4” SCH 35 PVC solid sewer pipe.
          D.1.3. Installation of two underground double-sweep cleanouts.
          D.1.4. Installation of approximately 440 ft of sewer force main (2" PVC, SCH 40).
          D.1.5. Installation of a 1,500-gallon 2-compartment concrete septic tank with effluent filter, for 
          main house.
          D.1.6. Installation of a 1,900-gallon concrete pump tank and controls (Liberty FL70 Series ¾ HP 
          submersible effluent pump or equal, for main house.
          D.1.7. Installation of a 1250-gallon 2-compartment septic tank with pump and controls (Orenco 
          PF5005 1/2 HP submersible effluent pump or equal), for ADU.
          D.1.8. Installation of a valve box and 1.5” PVC SCH 40 manifold.
          D.1.9. Installation of approximately 240 linear feet of sand-lined trench drainfield with 1” PVC SCH 
          40 lateral pipes.
          D.1.10. Installation of a 1 HP submersible well pump (Goulds 10GS10 or equal) and controls
          D.1.11. Installation of approximately 90 linear feet of 1.25” SCH 120 PVC drop pipe and   
          submersible cable.
          D.1.12. Installation of a pitless adapter and well cap.
          D.1.13. Installation of two 81-gallon water pressure tanks (Amtrol WX255 or equal) and shared 
          pressure switch.
          D.1.14. Installation of approximately 180 linear feet of 1.25” SCH 40 PVC water service line to 
          ADU.
          D.1.15. Installation of approximately 280 linear feet of 1.5” SCH 40 PVC water service line to main 
          Home.
 

Bid Protests Not Available

Similar Past Bids

Roy Washington 04 Oct 2021 at 1 PM
Washington Not Specified
Location Unknown Not Specified
Apo Ap 26 Feb 2010 at 4 AM
Location Unknown 10 Mar 2022 at 5 AM

Similar Opportunities

Colorado 31 Jul 2025 at 4 AM (estimated)
Colorado 31 Jul 2025 at 4 AM (estimated)
Republic Pennsylvania 11 Jul 2025 at 4 AM
Republic Pennsylvania 11 Jul 2025 at 4 AM
Republic Pennsylvania 11 Jul 2025 at 4 AM