The contractor shall develop and test design changes required to upgrade the SP23 MK 98 Mod 6 Fire Control System Tube Interface Box (TIB) to account for the change in the power interface requirements between the TIB and the Variable Energy Eject Panel (VEEP). The Contractor shall design, document, validate and implement the new design within the TIB.
The contractor shall develop and test design changes required to upgrade the SP23 MK 98 Mod 6 Fire Control System Tube Interface Box (TIB) to account for the change in the power interface requirements between the TIB and the Variable Energy Eject Panel (VEEP). The Contractor shall design, document, validate and implement the new design within the TIB.