This will will consist of signalization of the intersection of Nevada Street and Bernal Avenue, construction of concrete curb extensions (bulb-outs) on the northwest and southwest corners with ADA compliant curb ramps, reconstruction of ADA curb ramp at the southeast corner, removal drainage inlet, installation of new storm drain manhole, removal of exiting concrete median and cobblestone and repaving of new asphalt concrete, as well as, signing and striping at and in the vicinity of the intersection.
Bid Protests Not Available