The work consists of the construction of a 2.45 million-gallon day (MGD) per- and polyfluoroalkyl substances (PFAS) water treatment plant (WTP) using Granular Activated Carbon (GAC). The treatment system will be housed in a 10,400 square foot masonry building. The building will contain filtration equipment, process piping, storage tanks, pumping equipment, electrical and chemical feed systems.
Bid Protests Not Available