Federal Bid

Last Updated on 28 Jan 2025 at 9 PM
Combined Synopsis/Solicitation
Tell city Indiana

Tipsaw-Saddle Mowing

Solicitation ID 12363N25Q4014
Posted Date 28 Jan 2025 at 9 PM
Archive Date 01 Feb 2025 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Usda Forest Service
Agency Department Of Agriculture
Location Tell city Indiana United states 47586

SCOPE  & LOCATION
The purpose of the project is to maintain the early successional habitat characteristics of designated wildlife openings. Contractor shall be able to identify and remove all unwanted woody vegetation 3-inches and less Diameter at Breast Height (DBH) in project area via mechanical mowing (i.e. bush hog). Contractor shall use a GPS device to stay within designated boundary area and access routes. 
Approximately 48.5 acres of early succession land may be awarded to be mowed. Base amount is 39.8 acres (units # 1-14) with potential optional line items being awarded pending funds up to an additional 8.7 acres. Work may begin on July 1, 2025, and run through November 30, 2025.
BACKGROUND
The project area occurs within Hoosier National Forest which includes streamside, roadside, steep/narrow trails, open-land, forest habitats and karst features (i.e. sink holes).

Wildlife opening units 4 and 7 were last mowed in 2019, units 5-6, 8, 12-14 were last mowed in 2021, and units 1-3, 9-11, and 15-17 were last mowed in 2022. Previous mowing specification in 2019, 2021, and 2022 were the same as current contract solicitation specifications.

Access routes will be cleared by Forest Service (FS) personnel of any major logs blocking access before Start of the contract. Any trees that come down after will be the contractors’ responsibility. FS personnel may be responsible if downed trees are complicated (i.e. large size, high volume or large clusters). 

Wildlife opening boundaries and access trails will not be flagged by FS personnel. This will all be determined by the use of a GPS device. 

Access routes may tend to wash out due to high volume of rains especially at creek crossings. FS personnel will have the access passable for machinery before start of contract. If the access route washes out, the contractor shall get permission from the Contracting Officer Representative (COR) before implementing improvements to gain access safely. 

PERIOD OF PERFORMANCE

Begins July 1, 2025, and concluding end of day on November 30, 2025.
 

Bid Protests Not Available

Similar Past Bids

Tell city Indiana 18 Jan 2025 at 12 AM
Perry Maine 21 May 2018 at 7 PM
Location Unknown 19 Aug 2015 at 4 PM

Similar Opportunities

Location Unknown 10 Jul 2025 at 4 AM
Detroit Oregon 15 Aug 2025 at 4 AM (estimated)
Washington District of columbia 01 Feb 2028 at 12 AM
Washington District of columbia 01 Feb 2028 at 12 AM