PROJECT LOCATION: This Project is in Seattle along a portion of Thornton Creek, and is approximately bounded by 30th Ave NE on the west, 37th Ave NE on the east, NE 105th Street on the south, and NE 110th Street on the north. PROJECT DESCRIPTION: This Project consists of the following elements of Work: installing a new 32-foot concrete culvert and bridge across 35th Ave NE; adding 500 feet of creek channel; adding 39,000 square feet of floodplain area; adding 44,000 square feet of riparian forest area. The Bid Form has been broken in three elements: Base Bid, Additive 1, and Additive 2. Base Bid: All construction work except those detailed in Additive 1 and Additive 2 Additive 1: Additional channel excavation and replacement with streambed aggregate Additive 2: Additional channel excavation and replacement with streambed aggregate and construction of hyporheic sections A and B
Bid Protests Not Available