Point Of Contact Not Available
SCOPE OF WORK: SITE WORK, 22,930 INTERIOR BUILD-OUT OF BUILDING A (TEMPLE) & NEW 1,480SF SHRINE B BUILDING Division 1 General Requirements: N/A Division 2 Existing Conditions: Selective Demolition, Demo Existing Structure at Bldg. B, Building A per drawing D1 Division 3 Concrete: Concrete Foundations and SOG at Bldg. B, GFRC Column Covers and Custom Window Surrounds both buildings, sand agg. & concrete SOG Division 4 Masonry: Brick Veneer at Bldg. B, CMU tooth and patch at Bldg. A Division 5 Metals: Building B Engineered Roof Trusses, Metal Framing, Steel Chanel Canopy / Columns, Steel Lintels / RTU Support at Building A Division 6 Wood and Plastics: Rough carpentry, Temporary Plywood Around Existing Shrine B, OSB Deck-Wood Fascia-Wood Sheathing at Bldg. B, Architectural Woodwork / Millwork, Shoe Cubbies and Accessories, Finish Carpentry, Crown Molding, Trim, Sold Surface Tops, Laminate Window Sills, Reception Counters, Coat / Shoe Millwork, Storage & Utility Cabinets Division 7 Thermal and Moisture Protection: Wall and Ceiling Insulation, Vertical and horizontal foundation insulation at Bldg. B, aluminum soffit – drip edge - Asphalt Shingles at Bldg. B, Louver with screen at Bldg. A & joint sealants, EPDM patch and flash at Building A Division 8 Doors and Windows: HM Doors, Glass Doors, Aluminum Frames, Aluminum Windows, Aluminum Storefront, Door Hardware, Interior Pass Thru Windows Division 9 Finishes: Gypsum Board Assemblies, Tile, Granite Tile, Ceramic Tile, Porcelain Tile, Carpet, Solid Vinyl, LVT, VCT, Rubber Base, Acoustical Ceiling Grid & Tiles, Painting Division 10 Specialties: Column Closures, Toilet Accessories, Toilet Partitions, RTU Roof Screens Division 11 Kitchen Equipment: Please reference kitchen equipment drawings and provide per plans. Division 21 Fire Protection: Building A Only – Design/Build per AHJ. Division 22 Plumbing: U/G sanitary, water, saw-cut/patch as required for new work, grease interceptors, gas piping, & plumbing fixtures, Roof overflow & roof drains Division 23 Mechanical: Includes ductwork, mechanical equipment, RTUs, EF’s, Exhaust Hood, T&B. Building A remove existing concentric unit. See kitchen equipment plans. Division 26 Electrical: Includes u/g conduit / wire for service, transformer, handholes, new panel, power receptacles, switchgear, lighting controls and communication conduits & fire alarm Division 31 Earthwork: Site demolition, site clearing and grading for detention basin & new site plan lay-out Division 32 Site Improvements: Exterior concrete, asphalt, concrete curb Division 33 Utilities: Includes all u/g electrical and site lighting, storm, sanitary and water services per plan.
Bid Protests Not Available