The Contractor shall provide all materials, equipment, labor, instruments, tools, supervision, management, per diem, and travel necessary to complete all work in accordance with the statement of work (SOW), attached drawings, specifications, and all other contract documents and requirements. The SOW consists of removing 2 existing power poles and replace with new power poles to include all associated crossarms and accessories. The SOW also consists of removing and replacing 3 Pot Type 50 KVA transformers and 1 other power pole cross arms at the Tenkiller Project Office. All installation will be in accordance with state and local requirements and specifications. Power poles, transformers and cross arms shall be new and meet current NESC industry standards.
This project will be a total turn-key contract with all work being performed by the Contractor. This project is located at Tenkiller Lake, OK.