State Bid

Last Updated on 18 Aug 2024 at 11 AM
RFP
Colorado

Telluride Courthouse Steps RFP

Solicitation ID 143
Posted Date 18 Aug 2024 at 11 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency San Miguel
Location Colorado United states
Request for Proposals Repainting the Historic Telluride Courthouse Front Steps Project Description Location: 305 West Colorado Ave, Telluride, CO 81435 The San Miguel County Parks & Open Space department is seeking qualified bidders to repaint and seal the historic concrete front steps of the historic Telluride Courthouse, 305 West Colorado Ave, Telluride, CO 81435. The project will include all preparations necessary to prepare, repaint and seal the steps, and protect the historic nature of the concrete and surrounding materials. The contractor must match the existing historic concrete steps look, as close as possible to existing conditions. Contractor must also provide all labor and materials necessary, excluding the paint and sealant to complete the job. The paint and sealant will be provided by the County. Refinishing must be completed by November 1st, 2024. The county was created in 1861 and San Miguel City was selected as the county seat. The first courthouse was a two-story brick structure located on the southwest corner of Colorado Avenue and Fir Street in 1885 to 1886. In 1887, San Miguel City changed its name to Telluride. The courthouse was destroyed by a fire on January 13, 1887 and the second and present courthouse was constructed in 1887. Scope of Services San Miguel County requests proposals include: Protect all surrounding surfaces including railings, historic stonework and wood trim. Carefully remove the old paint and acid etch the stairs in preparation for the new paint Repaint and seal the front steps/stairs Clean up and remove materials after project completion, the courthouse should be in visitor ready condition A pre-bid site visit at the courthouse location is mandatory in order to respond to this RFP. Please contact Greg Pollio (see below) to schedule. It is the responsibility of the bidder to arrange for a pre-bid site visit or a self-guided visit. Information Required for RFP Submittal Name of firm and complete contact information. Include the resumes of personnel who will be working on this project. A general statement of qualifications and at least three (3) examples of similar completed projects that have been completed by the firm or personnel who will be working on this project. Outline a general schedule for completion of the Scope of Services. Fees for services described in the Scope of Services. Submission Deadline: No later than 5 p.m. on September 6, 2024. Bids must be submitted to Greg Pollio either via email or physically dropped off by the RFP submission deadline. San Miguel County is an Equal Opportunity Employer San Miguel County reserves the right to accept or reject any or all bids. Award of bid shall be based on price, experience, references and the ability to perform the work as determined by San Miguel County. Contracts will be awarded accordingly upon review. Agreement for Services The contractor shall review and execute the Independent Contractor Agreement contract prior to beginning work. Upon award, this contract will define the project, the term and services to be performed. This is a legal-binding document between the contractor and San Miguel County. A draft Independent Contractor Agreement is attached for your review. Bidding Documents RFP packages may be obtained by accessing the details on the San Miguel County website https://www.sanmiguelcountyco.gov/Bids.aspx or contacting Greg Pollio at the Parks & Open Space department in Telluride (see details below). San Miguel County Contact Information Please contact for any questions and to schedule a site visit - Greg Pollio, Manager of Operations San Miguel County Parks & Open Space Dept. 333 West Colorado Avenue, 3rd Floor Telluride, CO 81435 Office: 970-369-5424 [email protected] The full bid package, plus attachments, photos and Independent Contractor Agreement are available through 5 p.m. September 6, 2024,
Bid Protests Not Available

Similar Opportunities