The work of this 187 calendar day project consists generally of furnishing all labor, materials, appliances, tools, equipment, transportation, services and supervision required to complete the pavement improvements, including, but not limited to: installing temporary barricades; removing existing asphalt concrete and striping markings; installing new asphalt pavements; replacing existing fuel service pit slab; storm drain pipe slip-lining; installing new striping markings; installing new joint sealant; placement of asphalt millings, temporary removal of taxiway light fixtures; installing new lights; removal and installation of airfield guidance signs; install electrical light can extensions and reinstall taxiway light fixtures and performing all associated work, including electrical work, all in accordance with the Contract Documents