The work to be done generally consists of installing prefabricated Trash Treatment Control Devices (TTCD) at three locations in the Tara Hills area. Work includes temporary water diversion and dewatering, roadway and structure excavation, temporary shoring, installation of TTCD units, reconstruction of sidewalk and roadway, and replacing roadway striping. Engineer’s cost estimate: $2,050,000
Bid Protests Not Available