The project is generally described as improving an existing dirt/grass trail with a 6 to 10-foot-wide asphalt multi-use trail within the Town-owned Suzanne R. Kane Nature Preserve. Other elements of the project include a wooden truss bridge, improvements to the existing parking area, drainage, and grading along the proposed trail. The Scope of Work is more fully set forth in the Bid and Contract Documents, which are available for download from the Town’s Bid Board.
Bid Protests Not Available