THIS IS ONLY THE ADVANCED NOTICE.
THE SOLICITATION INCLUDING ALL SUPPLY SPECIFICATIONS WILL BE POSTED AFTER May 15, 2010 FOR THE REQUIRED DOORS AND FRAMES GENERALLY DESCRIBED BELOW.
NO RESPONSE IS REQUIRED FOR THIS ANNOUNCEMENT.
This will be a small business set-aside.
NAICS Code: 423390
The above mentioned equipment must be supplied and delivered in June 2008 to Everglades National Park, Homestead, FL.
All material shall be FOB Destination, Everglades National Park, Homestead, FL.
ALL VENDORS WISHING TO BE CONSIDERED FOR THIS SOLICITATION MUST BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR) DATABASE PRIOR TO AN AWARD BEING MADE.
Point of Contact: William Leady
[email protected]
Purpose: Everglades National Park requires the following doors and frames:
Doors Measurements for Flamingo CampgroundsWalk in, 2nd restroom:Men's room door opening measures 41 5/8"X 87 %"
Door measures 7'X 35 %" Hinges on the left door opens in.Janitors Closet opening measures 40 %"X 82 'A"
Door 6' 7"X 35 3/4" Hinges on the right door opens in.Women's room door opening 413/4"X 87"
Door 6' 11"X35 W Hinges on the right, door opens in.Janitors Closet opening 40 5/8"X 82"
Door 6' 7"X 35 'A" Hinges on the left, door opens in. Pipe chase door opening 35"X 87 %"Door 7'X 29 3/4" Hinges on the right, door opens out.Walk in, 13t restroom:Men's room door opening 41"X 86 3/4"Door 6' 11"X 35 3/4" Hinges on the right, door opens in.Janitors closet opening 34'14"X 83"
Door 6' 7"X 29 %" Hinges on the right, door opens in.Women's room opening 41"X 86 %"
Door 6' 11"X 35 %" Hinges on the left, opens in.Janitors door opening 34 %"X 82 %"
Door 6' 7"X 29 %" Hinges on the left, opens in. Pipe Chase opening 35"X 86 3/4"Door 6" 11"X 29 3/4" Hinges on the left, opens out. A-Loop 1st restroom:Men's room door opening 40"X 82'A"Door 6'7"X 35 'A" Hinges on the left, opens in.Women's room door opening 40"X 82 3(1"
Door 6" 7"X 35 'A" Hinges on the right, opens in. Pipe Chase opening 36"X 82 IA"Door 6' 7"X 31 3/4" Hinges on the right, opens out. A-Loop ed restroom:Men's room door opening 40 1/8"X 82 1/2"Door 6' 7"X 35'A" Hinges on the left, opens in. Women's room door opening 401/8"X 82 34" Door 6' 7"X 35 %" Hinges on the right, opens in Pipe Chase opening 36 34"X 82 1/4"Door 6'7"X 31 %" Hinges on the right, opens out. T-Loop 1st restroom:Men's room door opening 40 1/4"X 86'A"Door 6' 11'34"X 35 3/4" Hinges on the left, opens in.Janitors door opening 34 %"X 82 %"
Door 6' 7"X 29 3/4" Hinges on the left, opens in.Women's room door opening 40 1/4"X 87 3/4"
Door 7'X 35 %" Hinges on the right side, opens in. Cont. T-Loop 1st restroomjanitors docTr opening 35 W'X 82 %"Door 6'7"X 29 'A" Hinges on the right, opens in. Pipe ctial" opening 34'X 88"Door 7'X 27 3/4" Hinges on the right, opens out.T-Loop 2nd restroom:[ 1Men's rooni door opening 4014"X 82 1/2"Door 6'7 1A"X 35''4" Hinges on the left, opens in. arriliVirs door opening 40 %"X 82 1/2"Door 6'7"X 35 "4" Hinges on the left, opens in.Women's door opening 40 34"X 82''4"
Door 6'7 1/4"X 35''4" Hinges on the right, opens in. Janitors door opening 40''4"X 82 %"Door 6'7"X 35 3/2" Hinges on the right, opens in. Pipe chase door 34 %"X 83"Door 6'7"X 29 'A" Hinges on the right, opens out.
FIBERGLASS DOORS AND FRAMESPART 1 GENERAL1.1 DESCRIPTION: The work of this section consists of furnishing anddelevering fiberglass doors and frames for exterior door openings.1.2 MATERIAL
A. Shop Drawings: Show elevations and details of each door and frametype, including jamb anchors, cutouts, reinforcements, and joints.B. Manufacturer's catalog cuts and installation recommendations.
1.4 PRODUCT HANDLING:A. Delivery: Ship doors and frames in cartons or crates.B. Storage: Store doors and frames under cover on raised supports.1.5 PROJECT CONDITIONS: Check actual frame openings by accurate fieldmeasurement before fabrication.1.6 WARRANTY: Submit written agreement on door manufacturer's standard formsigned by manufacturer, installer, and contractor agreeing to repair or replacedefective door and frame.1.7 IMPACT RESISTANCE: Doors shall be coastal zone impact rated based on ASTME1886 and E1996.PART 2 PRODUCTS2.1 GENERAL: Manufacture doors, frames, and accessories conforming to SDIrequirements equivalent to 16-gauge steel doors and frames. Manufacturer shallbe Chem Pruf or equal.2.2 FRAMES:A. Construction: One piece pultruded fiberglass reinforced plastic,minimum 1/4 inch wall thickness, jamb to head joints mitered andreinforced with FRP clips and stainless steel fasteners; conformingto SDI requirements for performance equivalent to 16-gauge steelframes B. Frame profile: 5 3/4 inches deep, 2 inches wide face; doublerabbeted with 5/8 inch high stop.C. Finish: Satin finish. 2.3 DOORS:A. Construction:1. Core: Phenolic impregnated resin honeycomb.2. Door Plates: Molded in one continuous piece, resin reinforcedwith hand laid glass fiber mat, nominal 1/8 inch thick,minimum 15 mil gel coated surface.3. Door Edges: Minimum three layers resin reinforced glass fibermat, nominal 3/8 inch thick, machine tooled.B. Finish: Satin finish. 2.4 FABRICATION:A. Minimum Reinforced Plastic (FRP) Doors:1. Minimum glass fiber to resin ratio: 30 percent2. Mortise for lockset and recess for strike plate in lockstile.3. Embed steel reinforcement for hinges in fiberglass matrix;provide for hinge leaf recesses in hinge stile.B. Fiberglass Frames:1. Mortise for lock strike and recess for strike plate in lockjamb.2. Reinforce for hinges and other indicated hardware.
NW-08-0001 08340-3PMIS 36435 FIBERGLASS DOORS AND FRAMES
END OF SECTION.
Bid Protests Not Available