SUBSTATION NO. 3 BUS FEEDER ADDITION - STRUCTURE & COMPONENTS - 2020 Design, fabrication, packing, and delivery of the Substation No. 3 Bus Feeder Addition - Structure & Components - 2020 consisting of the following: A. Aluminum framing members, support members, bracing members and connections. B. Base plates, splice plates, mounting plates, angles, etc. C. All required bolts, U-bolts, nuts, washers, etc. D. Aluminum electrical bus conductors. E. Insulators, arresters, instrument transformers, switches, and accessories. The Aluminum Bus and Structures shall be furnished and delivered to the City's Substation No. 3 Site located at 300 North Riverside Ave; St Charles, IL.