State Bid

Last Updated on 09 Mar 2022 at 4 PM
job contract
Barre Vermont

STOWE STPG SGNL (52)

Solicitation ID 56299%27,%20%27Window56299%27);
Posted Date 09 Mar 2022 at 4 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Agency Of Transportation Contract Administration
Location Barre Vermont United states
BEGINNING AT A POINT ON VT ROUTE 100 APPROXIMATELY 456.07 FEET (0.086 MILES) SOUTHERLY OF THE INTERSECTION OF WEST HILL ROAD (TH-6) AT STATION 215+20.00 (MM 4.076) AND EXTENDING NORTHERLY APPROXIMATELY 690 FEET (0.130 MILES) TO STATION 222+10.00 (MM 4.206). WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES ROADWAY WIDENING, DRAINAGE, THE ADDITION OF A LEFT TURN LANE, INSTALLATION OF A NEW TRAFFIC SIGNAL, AND OTHER HIGHWAY RELATED ITEMS.
Bid Protests Not Available

Similar Past Bids

Vermont Not Specified
Woodridge New york Not Specified
Barre Vermont 02 Feb 2022 at 4 PM
Barre Vermont 17 Jul 2024 at 3 PM
Vermont Not Specified

Similar Opportunities

Barre Vermont 11 Jul 2025 at 3 PM
Barre Vermont 08 Aug 2025 at 6 PM
Barre Vermont 10 Jul 2025 at 4 PM
Barre Massachusetts 17 Jul 2025 at 9 PM
Barre Massachusetts 11 Jul 2025 at 4 AM (estimated)