Contractor shall demonstrate in detail how they how they will use the attached floor plan and parts listing to meet all requirements in the Statement of Work. Overall space utilization and function has already been determined. The proposal shall meet the essential design package.
All offerors shall submit quotes in accordance with the Request for Quote (RFQ), SOW, Design Plan,Contractor Submittal Form, Furniture Parts Listings and SCA Wage Determination.
Attachments:
1) Request For Quote (RFQ)
2) Attachment 1- Statement of Work (SOW)
3) Attachment 2- Design Plan
4) Attachment 3- Furniture/Parts Listing
5) Attachment 4- Contractor Submittal Form
6) Attachment 5- SCA Wage Determination
Site Visit Information is listed in the RFQ Document; Please inform us of your intention to attend the site visit NLT 10 September 2021 (10 AM MST)
EDIT!!!!!! (Additional Documentaion) 9/17/2021 5:45 PM MDT
This amendment is to provide answers to contractor questions from the site visit held on monday 9/13/2021 @10 AM.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
ATTACHMENTS:
1) Revised SOW (Dated 9/17/21)
2) Materials Listing
3) Contractor Questions/ Answers
Primary POC: SSgt Umar Mansaray, 719-556-5548,[email protected]; Secondary POC: Darrell S. Haas 719-556-8529