The project is for the stair leveling consist of removing large granite stairs and providing a level sand base. One of the stone blocks will have to be replaced matching two stone blocks on the side that have been replaced recently. In order to remove the blocks the contractor will also have to remove and re-install the glass door and front the block is sitting on. Electric and ADT pad connected to the door will have to removed and re-installed. I plywood barrier would be put i place during the construction. The front concrete pad in front of the steps will have to be removed and re-done with the proper slope after the stairs are re-installed.
The Loading dock ADA ramp and stairs will have to be removed to the footings and re-installed using a solid pour and proper re-bar. All joints will be caulked and a anti-slip resistant cover put on the ramp and steps. ADA handrails will be Installed at completion.
The estimated cost of the project is between $ 2,500 and $ 100,000. The work will require a Federal Security Clearance for onsite personnel.
If you are interested in bidding this project respond by email no later than September 7, 2012, to [email protected] with your company name, contact person, address, phone number, fax number, Tax ID and DUNS number. You MUST state the Solicitation number of GS-06P-12-TN-C-0041. Proposal packages will be mailed to interested parties after that date. There will be a walk-thru of the project on September 12, 2012 AT 10:30 AM. All proposals submitted must allow 60 days for GSA acceptance. THIS REQUEST FOR SOLICITATION DOES NOT OBLIGATE THE GOVERNMENT TO MAKE AN AWARD. According to FAR 4.11 ALL contractors MUST be registered in System for Award Management (SAM.gov), before having their bid evaluated.