State Bid

Last Updated on 08 Sep 2022 at 10 PM
SSA
Washington

SR 20, Olson Creek, & Unnamed Tributary to Skagit River – Fish Passage Project

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Office Of Minority And Women's Business Enterprises
Location Washington United states
Point Of Contact Not Available
Sub-Proposals Requested for: SR 20, Olson Creek, & Unnamed Tributary to Skagit River – Fish Passage Project Owner: WSDOT Disadvantaged Business Enterprise Goals Design: 16% Construction: 21% Proposal Due Date: September 28th, 2022, at 11:59 PM PDT Subcontractor Proposals Requested: September 23rd, 2022, at 5:00 PM PDT Atkinson is bidding the above referenced Design-Build project as a prime contractor. We are committed to supporting, assisting, and providing equal opportunity to Disadvantaged Business Enterprises. In furthering that commitment, we invite all Subcontractors and Suppliers to bid on the referenced project. If you require information or assistance regarding obtaining certifications and registration, or any related service, please call our office. Project Description: The purpose of this Project is to remove the existing barriers to fish passage at two locations along SR 20 and replace removed barriers with fish passable structures. The Project’s critical improvements shall provide fish-passable water crossing structures in fish passage restricted areas to mimic natural stream processes and incorporate elements of stream restoration to maximize stream function through the inclusion of natural stream elements. The Project’s work shall be conducted and performed in such a manner as to minimize adverse impacts to the public while and maximize transparency and communication with local communities. Subcontractor Opportunities Include: engineering design, permit acquisition, utility relocation, soil nails, soldier pile, sawcutting, landscaping, traffic control, trucking, HMA & concrete paving, signage, guardrail, TESC, slope protection, demolition, rebar, earthwork, fencing, painting, sweeping, striping, drainage, electrical/intelligent transportation systems, large woody material installation, creek channel grading, and more. Project Documents: Documents are available for download, at no cost, at the address below. https://wsdot.wa.gov/business-wsdot/contracting-opportunties/sr-20-olson-creek-and-unnamed-tributary-skagit-river-fish-passage Submit Quotes to Attn: Dom Fisher 707 S. Grady Way, Ste. 500, Renton, WA 98057 Tel: (425) 255-7551, Fax: (425) 255-7325 Email: [email protected] Closing Date: Wednesday, September 28, 2022 Organization: Guy F. Atkinson Construction, LLC Point of Contact: [email protected]
Bid Protests Not Available

Similar Opportunities

Location Unknown 14 Jul 2025 at 4 AM
Location Unknown 11 Jul 2025 at 4 AM
Matanuska-susitna Alaska 12 Jul 2025 at 9 AM (estimated)