The project consists primarily of electrical upgrades to the lab areas of
SPAWAR B3146. The project will include electrical power upgrades to support
additional telecom/data rack equipment loads within the building and future
mechanical (HVAC) loads. Work will include the installation of new
transformer and pad, switchgear, cable trays, panel boards, power cabling,
and sidewalks. Other work in support of future installation of new HVAC
equipment including Computer Room Air Conditioning Units, air cooled
chiller, pumps, piping, and controls will also be included.