PROJECT LOCATION: 1590 NW 90th St., Seattle, WA PROJECT DESCRIPTION: Elements of the Work include, but are not limited to: Converting an existing natural turf playfield to a new all-season multi-sport synthetic turf playfield with new LED athletic field light infrastructure. The project will also include installation of new ADA accessible pathways, site retaining walls, site furniture, landscaping, and irrigation. Additive #1: Storage Shed & Batting Cage Additive #2: Concrete Monumental Seating Additive #3: Light Poles, Fixtures, & Wiring Additive #4: New Concrete Access Ramp from 15th Ave. N. to Parking Lot Sidewalk ENGINEER’S ESTIMATE: Base: $3,942,596.00; Additive #1: $75,624.00; Additive #2: $17,040.00; Additive #3: $341,700.00; Additive #4: $27,120.00 For purposes of the Inclusion Plan, this is considered a Park Development type of project with a Past Performance of 25% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan, please contact Miguel Beltran at
[email protected] or 206-684-4525. Back-up contact is Carmen Kucinski at
[email protected] or 206-684-0188.
Bid Protests Not Available