I general, the project will provide repairs to infrastructure in the area that is failing as well as revise hard scape between the soccer field, bleachers, Stadium Way, and Tenth Street so as to adhere to ADA code compliance requirements. Excavate, frame and install flat work for west side bleacher structure including necessary circulation and flat work required for path of travel to CEFCU and Stadium Way. Excavate, frame and install flat work for the east side press box area and as required to meet ADA requirements for path of travel to the existing pedestrian gate along 10th street.