The full text of the FAR, DFAR, and AFFARS can be accessed on the Internet at http://farsite.hill.af.mil.
The Defense Priorities and Allocation System (DPAS) assigned rating is: none.
Addendum to FAR 52.212-1 Instructions to Offerors - Commercial Items
As prescribed in FAR 12.302(d) the following addendum is provided for solicitation provision FAR 52.212-1 and hereby amends any language therein:
Quotation Preparation Instructions:
A. To assure the timely and equitable evaluation of quotations, vendors must follow the instructions contained herein. Vendors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors and if applicable, sub-factors. Quotations submitted in response to this Combined Synopsis/Solicitation must address the following evaluation factors which include a price quote and technical qualifications as follows and defined in paragraph B - Quote Specifics.
B. Quote Specifics: All quotes must include the following information:
1. Company's or individual's complete mailing and remittance address.
2. The following factors will be used to determine the best value to the NAFI:
a. Technical Capability
b. Past Performance (Recent and related work history with references)
c. Renumeration
REQUEST FOR QUOTE
Quotes due by Wednesday, 23 April 2014 @ 12:00 Local (Spanish) time
The quote shall be valid through 23 May 2014
1.Company Info: Please provide the following information:
Company Name:_________________________________________________________________
DUNS #__________________________ NATO Cage Code Number:_________________
POC: _____________________________ Tel:____________________________________
Email: _________________________________________________________________________
Please complete the unit price/extended amount below:
ITEM DESCRIPTION Quantity Unit Unit Price Extended Amount
0001
Snack Bar Concessionaire at Moron Bowling Center
1
Lot N/A N/A
* No organized site visit has been set up. If you feel you need a site visit, please contact TSgt Jordan Bonds at [email protected]
2. Period of Performance. The government anticipates awarding a Firm-Fixed Price contract. The period of performance will consist of a base year from 9 May 2014 to 8 May 2015. There will be three additional Option Years. The period of performance for Option year 1 will be from 9 May 2015 to 8 May 2016. The period of performance for Option year 2 will be from 9 May 2016 to 8 May 2017. The period of performance for Option year 3 will be from 9 May 2017 to 8 May 2018. There will be an additional option to extend the term of this contract for up to an additional 6 months at any point during the life of this contract.
3. Statement of Work. All work performed under this contract must be done in strict accordance with the Statement of work titled, Performance Work Statement (PWS) Snack Bar Concessionaire Contract at Moron Bowling Center.
D. Quotes are due to this office no later than 12:00 p.m. Local (Spanish) Time, 23 April 2014. Quotes must be sent via e-mail to [email protected]
Vendors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
(End Addendum)
If the Government issues an order resulting from a quotation, the Government may (by written notice to the supplier, at any time before acceptance occurs) withdraw, amend, or cancel its offer.
FAR 52.212-2 Evaluation - Commercial Items (Jan 1999)
(a) Award Basis: The Government's evaluation of quotation will fully account for the evaluation factors identified and required under the Addendum to FAR 52.212-1. The evaluation of these factors will utilize the lowest price technically acceptable (LPTA) award basis. Quotes that do not meet the quote specifics will be deemed technically unacceptable, and therefore not considered for award.
The Government intends to evaluate quotations and award a contract without exchanges or communications and therefore, quotations should contain the vendor's best terms.
(b) Evaluation: Evaluation factors required under 52.212-1 will be evaluated by the Government as follows;
a. Technical Capability: A vendor's quotation will be considered technically acceptable if it meets the requirements detailed in paragraph C of the Addendum to FAR 52.212-1. Quotations that do not meet these requirements will be considered unacceptable and therefore, under the LPTA evaluation process will not be considered for award.
b. Past Performance (Recent and related work history with references): Vendor will be required to provide at least one recent (within three years) reference of work related in nature (food service concessionaire), without adverse performance.
c. Remuneration: Contractor's must provide the minimum rate of remuneration as stated in sections 1.5.7 of the attached PWS. Offers in excess of this required value will be evaluated in determination of the best value for award.
(c) Award Determination: As a result of the Government's aforementioned evaluation, only those vendors, whose quotes are determined to be technically qualified, and therefore technically acceptable, will be considered for award. The award will be made to the responsible offeror whose offer, conforming to the solicitation; will be most advantageous and in the best value to the NAFI.
(End Provision)
In accordance with FAR 13.004 -- Legal Effect of Quotations the following information is provided in regards to quotations.
A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a supplier's quotation does not establish a contract. The order is an offer by the Government to the supplier to buy certain supplies or services upon specified terms and conditions. A contract is established when the supplier accepts the offer.
When appropriate, the Contracting Officer may ask the supplier to indicate acceptance of an order by notification to the Government, preferably in writing. In other circumstances, the supplier may indicate acceptance by furnishing the supplies or services ordered or by proceeding with the work to the point where substantial performance has occurred.
If the Government issues an order resulting from a quotation, the Government may (by written notice to the supplier, at any time before acceptance occurs) withdraw, amend, or cancel its offer.
If you have any questions or concerns, please contact one of the following:
Primary point of contact
Contracting Officer: TSgt Jordan Bonds
Telephone: (+34) 95-584-8134 or Email: [email protected]