The project will entail the removal of existing pavement and replacement with approximately 7,400 S.Y. of 6-inch thick, 22-foot wide concrete pavement, driveway replacement, ditch regrading, and installation of approximately 1,000 L.F. of storm sewer pipe including 18” to 30” RCP including arch pipes along Washington-Irving Drive, Sleepy Hollow Drive, and Rip Van Winkle Drive. The project also includes replacement of 2,900 L.F. of 8” water line, 337 L.F. of 8” sanitary sewer replacement, and all labor, equipment, materials, and incidentals required for project.
Bid Protests Not Available