The following items, at minimum, will be required for a 120' X 120' Skate Park to be placed on an existing asphalt pad. There shall be a total of 13 items included, with the remaining 4 items up to the discretion of the contractor to design. Features may be attached/combined for ease of design/flow (for example, the Half Pipe may be part of the same structure as the Bowl.)
32'L X 27.5'W X 5-6'H Half-Pipe
22'W X 42.5'L X 4-6'H Bowl
16'W X 28'L X 3'H Beginner Half-Pipe
10.5'W X 16'L X 3'H Quarter Pipe
Elevated Street Plaza- This structure includes stairs with a grind rail, planters, bank ramps, and quarter pipe
Pyramid Fun Box- including grind rail, bank ramps, wedges, planters and a wedge pyramid
Bank and Quarter Start Ramps
Extended Pyramid Corner- including bank ramps, pyramid corners, and a grind box
Pyramid Fun Box- including bank, bank ramps, planter and grind boxes
The Contractor shall provide all parts, labor, tools, equipment and supervision necessary to deliver (including all offloading and placement at the work site), and fully install all compents/features, framework, framework enclosures, and safety rails in accordance with the statement of work.
THIS ACQUISITION IS BEING ISSUED AS A 100% SMALL BUSINESS SET-ASIDE Identified by North American Industry System Classification (NAICS) Code 332999 and a size standard of 500 employess.
This office proposes to post solicitation number FA4460-11-T-0059 to the FedBizOpps website (https://www.fbo.gov) on or about 12 August 2011. Once the solicitation is issued it is incumbent upon the interested parties to review the site frequently for any updates/amendments to any and all documents. Contract award will be determined using the procedures of FAR Parts 12 and 13. All Contractors shall be ORCA registered (http://orca.bpn.gov). All Contractors are reminded, in accordance with DFARS 252.204-7004, Required Central Contractor Registration, that lack of registration in the CCR database BY AWARD DATE will make a contractor ineligible for award. Please acknowledge all requirements in proposals. NO PARTIAL QUOTES WILL BE CONSIDERED. NO PARTIAL AWARDS WILL BE MADE.